Table of Contents
Toggle
Unit II Project Unit II Project OpenInstructionsDo you need a similar assignment done for you from scratch? We have qualified writers to help you. We assure you an A quality paper that is free from plagiarism. Order now for an Amazing Discount! Use Discount Code ?Newclient? for a 15% Discount!
Unit II Project
Unit II Project Open

Weight: 10% of course grade
Grading Rubric

Instructions
Budget Proposal For this assignment, you will establish a rough budget for your proposal. At this point, you have determined what your proposal will look like so you will need to identify which type of budget will be most relevant to your proposal. Your textbook offers a sample of each of the two types: project-specific (Table 9.3, page 273) and annual operating (Table 9.4, page 276). You may use either a spreadsheet or a table to develop your budget for submission. Key areas that are required include, but are not limited to:

Salaries
Materials/supplies
Funding/revenue projected

Your budget must be a minimum one page in length, but it could be longer depending on the type of proposal you have developed in Unit I.
Please ensure the following textbook is including in the answer: Calley, N. G. (2011). Program development in the 21st century: An evidence-based approach to design, implementation, and evaluation. Thousand Oaks, CA: Sage.

.